Home » News & Notices » Public Notice

Public Notice

Nov 20 2008
VIGILANCE BULLETIN
Vigilance Bulletin 2008
 
May 13 2008
Status of Bills received from Contractors/Vendors of RVNL.
Please download the file to view.
 
May 06 2008
Master Management Information System maintained by Department of Public Enterprises concerning PSUs.
Master Management Information System - Data for the period Jan to March 2008
 
Apr 28 2008
Code of Business Conduct and Ethics for Board Members and Senior Management Personnel of RVNL.
Please download the file.
 
Aug 22 2007
Addendum/Corrigendums of RVNL Standard Specifications for S&T, Electrical Engineering and Civil Engineering Departments.
Addendum/Corrigendum No. 1 to 6.
 
Jul 05 2007
Status of Applications for the posts on Deputation and Re-Engagement
Please download the file.
 
Jun 20 2007
Shortlisting of agencies for Preliminary and/or /Final Location Survey of the Railway
Empanelled Agencies
 
Mar 20 2007
Information on Rajbhasha
Please download the file.
 
Mar 06 2007
NOTIFICATION OF AWARD FOR PROCUREMENT OF GOODS FUNDED BY ADB
Please download NOTIFICATION OF AWARD FOR PROCUREMENT OF GOODS.
 
Jul 07 2006
SHORT RESETTLEMENT PLAN FOR RAJATGARH-BARANG RAILWAY LINE DOUBLING
Short resettlement plan
 
Jul 07 2006
RESETTLEMENT PLAN DOUBLING OF RAILWAY LINE BETWEEN GOOTY-PULLAMPET IN ANDHRA PRADESH, INDIA
Resettlement plan
 
Jul 06 2006
RESETTLEMENT PLAN CUTTACK - BARANG DOUBLING OF RAILWAY LINE PROJECT
CUTTACK - BARANG DOUBLING OF RAILWAY LINE PROJECT
 
Oct 30 2005
RVNL Standard Specifications for Signalling & Telecommunications Department with corrigendum No. 1
Standard Specifications for Materials and Works Volume III - Signalling & Telecommunications Works
 
Oct 30 2005
RVNL Standard Specifications for Electrical Engineering Department with corrigendum No. 1
Standard Specifications for Materials and Works Volume II - General Electrification & Railway Electrification Works
 
Oct 29 2005
RVNL Standard Specifications for Civil Engineering Department with Corrigendum No. 1
Standard Specifications for Materials and Works Volume I for Engineering Works
 
Jan 31 2005
Social Resettlement & Rehabilitation Plan of Aligarh-Ghaziabad 3rd line 106.15 km UP
The proposed 3rd railway line between Aligarh and Ghaziabad is in the state of Uttar Pradesh and passes through four districts viz. Gautam Budh Nagar, Ghaziabad, Bulandshahr and Aligarh.
 
Jan 31 2005
Social Resettlement & Rehabilitation Plan of Barang - Khurda Road 3rd line 35 km Orissa
The proposed construction of third railway line along the existing double line section from Barang to Khurda-Road (34.945 km) of East Coast Railway has been posed by Rail Vikas Nigam Limited (RVNL) under Ministry of Railways for possible funding by the ADB. The project is situated in Cuttack and Khurda districts of Orissa.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Cuttack - Barang doubling 12.1 km Orissa
The Cuttack -Barang single line section of East Coast Railway on Howrah- Chennai main line is situated in district Cuttack of Orissa.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Gooty - Pullampet Doubling - 151 Km AP
The proposed doubling of the Pullampet- Gooty broad gauge line lies entirely in the State of Andhra Pradesh. Gooty - Renigunta is a single line non-electrified section of 280 kms.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Raichur-Guntakal doubling 81 km Karnataka
Railway line between Raichur and Guntakal passes through two states – Andhra Pradesh and Karnataka Majority of the line is in Kurnool district of Andhra Pradesh. A small portion, starting from Raichur up to Tungabhadra river is in Raichur district of Karnataka, out of which Raichur-Matamari portion (17.03 KM) has already been doubled. Remaining portion from Matamari to Tungabhadra river is approximately 10 Km. Similarly a small portion (5 Km stretch) towards the other end of the section, after Nancherla up to Guntakal, falls in Anantapur district of AP.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Rajatgarh - Barang 20 km Orissa
At present, Rajathgarh to Barang has single line 25 km in length. It is proposed to double this line to meet the increasing demand of traffic. Rajatgarh-Barang single line section is part of Talcher-Rajatgarh-Barang section (98 km) which joins Howrah-Madras East Coast main line at Barang. It is an important branch line, which was commissioned on 19.11.1966. The purpose of the construction of this line was to give connection to Talcher Coalfields with Howrah-Madras main line.
 
Nov 03 2004
Short Resettlement Plan for Bhatapara - Urkura 3rd Line Project in the State of Chattisgarh