| ID |
Subject |
Date & Time |
If Updated |
Download |
| 20080030 | Providing consultancy services for Detailed Engineering Design & Drawing of major Railway bridge sub-structures, buildings & other civil structures at stations in connection with doubling between Sambalpur- Titlagarh in ECoR. | Opening Date 02-06-2008
Closing Date & Time 28-08-2008 06.00 PM |  06-08-2008 |  Download File |
| 20080034 | Design,Supply,Erection,Testing & Comms. of 25 KV, 50HZ, Single Ph, Tr. OHE, Switching Stns. & other works for RE between Kondapuram(Excl)–Guntakal (Incl) Sec. & Sidings at Cuddapah,Yerraguntla, Kalamalla,Muddanur,Challavaripalle, Tadipatri,Jutur,Guntakal | Opening Date 10-06-2008
Closing Date & Time 23-07-2008 11.00 AM |  14-07-2008 |  Download File |
| 20080040 | Design, Supply, Installation, Testing & Commissioning of S&T Equipment with Panel Interlocking (Route Setting type) at 12 stations & alteration in Raichur Stn. in connection with Doubling work in Raichur-Guntukal Sec. of SCR. | Opening Date 27-06-2008
Closing Date & Time 30-07-2008 05.00 PM |  23-07-2008 |  Download File |
| 20080041 | FLS, marking of centre line for final alignment on ground, preparation of connected drawings and approval, for Dallirajraha - Rowghat new rail link (95.00 Km) on Raipur Division of South East Central Railway of chhattisgarh state. | Opening Date 05-07-2008
Closing Date & Time 09-08-2008 06.00 PM |  06-08-2008 |  Download File |
| 20080042 | Const. of roadbed, major & minor bridges & facilities, supply & installation of track (excl supply of rails & ord. track sleepers), signaling & Elec. (RE & Gen. Elec.) work in connection with GC of NG to BG line in Bharuch-Samni-Dahej Sec. (62.36 kms) | Opening Date 10-07-2008
Closing Date & Time 30-09-2008 05.00 PM |  05-09-2008 |  Download File |
| 20080043 | PMC for Supply, Erection, Testing & Commissioning of 25 KV A.C single phase 50 HZ Traction OHE, Switching Stns, Traction Sub stns, SCADA, S&T works & other associated Civil Works in NRE (Excl) – GTL (Incl) Section in Guntakal Divn. of SCR. | Opening Date 01-08-2008
Closing Date & Time 02-09-2008 11.00 AM |  20-08-2008 |  Download File |
| 20080044 | Construction Of Quarters, Service Buildings, Modifications to Platform Shelters & Girder/Arch Bridges, Height Gauges at LC Gates, Roads, Electrical Sub Stations, Etc. in Connection with Civil Works of RE between Nandalur - Guntakal on Guntakal Division o | Opening Date 13-08-2008
Closing Date & Time 26-09-2008 11.00 AM | |  Download File |
| 20080045 | CONSTRUCTION OF TYPE-I,II,III &IV QUARTERS,TOWER WAGON SHED,PSI DEPOT,AEE OFFICE, HEIGHT GAUGE , ARRENGEMENT FOR OHE MAST ON BRIDGES & OTHER ANICIALLARY WORKS IN CONNECTION WITH JAROLI-TOMKA SECTION (146.0 KM) ON KUR DIVISION OF ECoR IN ORISSA STATE, IND | Opening Date 14-08-2008
Closing Date & Time 15-09-2008 00.00 AM | |  Download File |
| 20080046 | Supply , execution of Signalling and Telecommunication works in connection with Railway Electrification of Jaroli- Tomka section in Jakhapura-
Daitari – Banspani Branch Line of ECoR. | Opening Date 28-08-2008
Closing Date & Time 29-09-2008 05.00 PM | |  Download File |
| 20080047 | Construction of 43 staff quarters at Rakhi, Balwara, Ladermer, Bakra Road, Jagannathji etc. stations of Samdari - Bhildi section of North Western Railway. Approximate Cost:- Rs.2.30 Crore. | Opening Date 29-08-2008
Closing Date & Time 29-09-2008 03.00 PM |  28-08-2008 |  Download File |